Our Services

Complete Waterproofing & Construction Services

From roof waterproofing to expansion joint treatment, we handle every aspect of building envelope protection using certified BASF, Sika, and Pidilite systems.

🏠
Service 1 of 6

Roof & Terrace Waterproofing

Permanent waterproofing solutions using CPWD-approved systems

Applications

Flat terracesSunken slabsPodium decksIndustrial roofsInstitutional buildings

Materials Used

Starproof WF SP-600Sika SBR 100TapecreteChemicreteEpoxy Resin + HardenerPU SealantAcrylic Polymer Modified Cementitious Coating
Warranty: 10 years on stamp paper
Request Quote

● Our Process

  1. 1Surface preparation β€” cleaning, dedusting, curing if required
  2. 2Crack mapping and V-groove cutting along all cracks
  3. 3Epoxy crack filling (resin + hardener + silica powder blend)
  4. 4PU sealant application at joints and pipe penetrations
  5. 5SBR mortar repair (1:4 cement–sand with Sika SBR 100) on damaged surfaces
  6. 6Two-coat application of Starproof WF SP-600 or equivalent PU/acrylic cementitious coating
  7. 7Geotextile membrane layer where specified
  8. 8Final inspection and 10-year warranty bond on stamp paper
πŸ”§
Service 2 of 6

Expansion Joint Treatment

EPDM membrane systems for permanent expansion joint waterproofing

Applications

Multi-storey buildingsInstitutional campusesIndustrial complexesBridges and flyoversTerrace and floor joints

Materials Used

BASF Master Brace EpoxyEPDM Membrane (Sika / Pidilite)Geotextile Membrane 150 GSMAluminium Plate (Powder Coated)Chemical Fischer FastenersSBR Mortar
Warranty: 10 years on stamp paper
Request Quote

● Our Process

  1. 1Edge repair using SBR mortar (1 bag cement : 4 parts sand : 5kg D-623 SBR BASF)
  2. 2Surface priming with BASF Master Brace Epoxy primer
  3. 3EPDM membrane fixing (Sika/Pidilite, 300mm wide, 75mm on each side)
  4. 4Geotextile membrane (150 gsm) laid as segregation layer
  5. 5Powder-coated aluminium plate (2mm/3mm) fixed with chemical Fischer fasteners
  6. 6L-shape aluminium plate at wall and floor junctions
  7. 7Silicone sealant finishing at edges
  8. 810-year warranty bond on stamp paper
⚑
Service 3 of 6

Epoxy Crack Repair & Nipple Grouting

Structural crack repair with epoxy resin and GI nipple grouting

Applications

Concrete wallsRCC slabsColumns and beamsRetaining wallsBasement structures

Materials Used

Epoxy ResinHardenerSilica PowderGI Nipple (12mm dia)Inter Plaster EPPOP Wall Putty
Warranty: 1 year for crack repair
Request Quote

● Our Process

  1. 1Crack mapping and condition assessment
  2. 2V-groove cutting along all structural cracks
  3. 3Epoxy blend preparation (resin + hardener + silica powder)
  4. 4Crack filling with epoxy blend and POP wall putty finishing
  5. 5GI nipple drilling at 300mm intervals for active water seepage
  6. 6Cement + Inter Plaster EP + water slurry grouting through GI nipples
  7. 7Surface finishing with cement plaster 1:3
πŸ—οΈ
Service 4 of 6

Structural & Preventive Maintenance

Comprehensive preventive maintenance for long-term building health

Applications

Institutional campusesCommercial complexesIndustrial facilitiesResidential buildings

Materials Used

Bituminous Flashing TapeTapecreteChemicreteCement Concrete 1:2:4SBR MortarAluminium Expansion Joint Plates
Request Quote

● Our Process

  1. 1Building condition survey and defect mapping
  2. 2Gola making (75x75mm) in cement concrete 1:2:4 at parapet-slab junction
  3. 3Bituminous flashing tape (500mm wide) fixing at all vulnerable junctions
  4. 4Down-tack pipe packing with waterproofing mortar and brick
  5. 5Acrylic polymer modified cementitious coating (Tapecrete) on surfaces
  6. 6Nipple grouting for active water ingress
  7. 7Final surface treatment and finishing
πŸͺœ
Service 5 of 6

Industrial Scaffolding

Safe, certified scaffolding for large-scale institutional and industrial projects

Applications

Large institutional buildingsIndustrial structuresHigh-rise buildingsMaintenance projects

Materials Used

MS Scaffolding TubesScaffolding CouplersBase PlatesScaffolding Boards
Request Quote

● Our Process

  1. 1Site survey and scaffolding design
  2. 2Scaffolding base plate and sole board installation
  3. 3Vertical standards, ledgers, and transoms erection
  4. 4Safety nets, toe boards, and guard rails as per IS standards
  5. 5Third-party inspection if required
  6. 6Systematic dismantling and material removal after project completion
🏭
Service 6 of 6

Industrial & Protective Coatings

Protective coatings for industrial facilities and commercial buildings

Applications

Factory floorsIndustrial roofsChemical storage areasParking decks

Materials Used

Epoxy PrimerPU CoatingSikalastic 350Acrylic Polymer Cementitious Coating
Request Quote

● Our Process

  1. 1Surface preparation and degreasing
  2. 2Primer coat application
  3. 3Epoxy or PU coating system application
  4. 4Finishing coat with desired texture and colour
  5. 5Quality inspection and documentation

Not sure which service you need?

Our expert will assess your site and recommend the right solution. Free site assessment, no obligation.

We respond within 2 hours Β· No spam, ever

Chat Now